Flooring Quantity Calculator

Turn a room's dimensions into a shopping list: floor area, the cutting allowance your layout actually needs, box count from the coverage on the packaging, and underlay area. Straight, diagonal and herringbone layouts covered.

What you'll need before you start
  • Room length and width at the widest points — measure into alcoves and doorways
  • Your layout: straight, diagonal or herringbone — it sets a typical waste figure you can override
  • The m² per box printed on your flooring's packaging — it varies between products
  • Whether you're laying underlay too (the calculator allows area + 5%)

Enter Your Measurements

All measurements update results instantly. Toggle Met/Imp in the header.

m widest point
m widest point
sets a typical waste figure
% for cuts, borders and rejects
m² printed on the box
Your Results Estimates for planning
Room Area
length × width
0
Area with Waste
plus your cutting allowance
0
Boxes
at your m² per box, rounded up
0
Underlay
area + 5% for trimming
0
Total Flooring Required 0

Measuring the Room and Choosing a Waste Figure

Measure the room at its widest points — into bay windows, alcoves and door reveals, because the floor goes there too. For L-shapes, split the room into rectangles, run each through the calculator, and add the areas before dividing by box coverage. Old rooms are rarely square: if the two diagonal measurements differ noticeably, use the longer dimensions, since out-of-true walls eat into your cutting allowance at every border.

The waste allowance is where flooring maths earns its keep. Straight (parallel-to-wall) layouts cut mostly at the room edges and can reuse many offcuts at row ends, so about 7% is the typical allowance. Diagonal layouts cut every border board at an angle, and the resulting offcuts are too short to reuse — about 12% is typical. Herringbone and similar patterns cut both ends of many pieces and stagger the waste further still — about 15% is typical. These are common trade figures, not rules: narrow boards, very long rooms and heavily notched borders all push the figure up, and the product's own installation sheet may state its own allowance, which should win.

Boxes are counted by coverage, not by plank count. Laminate and engineered products print m² per box on the packaging (commonly somewhere between 1.5 and 2.8 m²), and it differs between products with the same plank count. Divide the waste-adjusted area by the printed coverage and round up — always up, because you cannot buy part of a box.

What the Results Mean

  • Room Area: The actual footprint — what your underlay and any rolled products are sized against.
  • Area with Waste: Footprint plus the cutting allowance. This is the number the box count comes from.
  • Boxes: Waste-adjusted area ÷ box coverage, rounded up. Have one extra unopened box on top for repairs (see below).
  • Underlay: Room area + 5%, the usual trimming allowance for cutting underlay to fit and lapping at doorways.

One Extra Box and Lot Matching

Two habits separate a planned job from a scraped-together one. First, buy one extra box beyond the calculator's count and leave it unopened: flooring is manufactured in batches, and the plank you chip two years later can only be matched from the same batch. Second, check the lot (batch) number printed on every box before you open anything — mixing lots in one room shows as visible bands of slightly different tone or grain. Open three or four boxes at a time and work from them together, which blends natural variation instead of concentrating it. The flooring quantity guide covers layout planning in more depth.

Pro Tip

Acclimatise the boards before laying — typically 24–48 hours in the room, boxes open, per most manufacturers' instructions — and stagger end joints between rows by at least 300 mm (12 in) where the product requires it. Both rules consume more usable length than people expect, which is exactly what the waste allowance is for.

The Math Behind the Calculator

One multiplication, one percentage uplift, one division — all rounded up:

area = room_length × room_width
allowance = area × (1 + waste% ÷ 100)
boxes = ceil(allowance ÷ coverage_per_box)
underlay = area × 1.05

Typical Waste by Layout

  • Straight: 7% — cuts at borders only, row-end offcuts reusable
  • Diagonal: 12% — angled cuts at every border, offcuts rarely reusable
  • Herringbone: 15% — both ends cut on many pieces, plus border splines

These are typical trade allowances and they vary by product, plank width, room shape and fitter. The layout select sets the field to the typical figure; override it if your installation sheet says otherwise.

Assumptions & Limitations

Every number above rests on these constants. If your project differs, change the matching input — or read the linked guide for the full reasoning.

  • Rectangular room; L-shapes are split into rectangles and run separately
  • Waste figures (7 / 12 / 15%) are typical trade allowances, not product rules — the installation sheet outranks them
  • Box coverage as printed on the packaging — verify before ordering
  • Underlay allowed at area + 5%; some systems need a separate vapour barrier over concrete
  • One extra unopened box and matching lot numbers recommended on top of the calculated count
  • Quantities only — this site deliberately does not price labour, delivery or materials

Worked Example: 27 m² Lounge in Herringbone

A lounge 6 m × 4.5 m (19.7 × 14.8 ft) being laid in herringbone, with the chosen product packing 2.37 m² (25.5 sq ft) per box. The layout select sets the waste field to 15%.

  1. Area: 6 × 4.5 = 27 m² (291 sq ft).
  2. Waste allowance: 27 × 1.15 = 31.05 m².
  3. Boxes: 31.05 ÷ 2.37 = 13.1, rounded up = 14 boxes.
  4. Underlay: 27 × 1.05 = 28.35 m².
  5. Practical order: 14 boxes plus one extra unopened spare = 15 on hand.

Flip the layout to straight and the same room takes 27 × 1.07 = 28.89 m², which is 28.89 ÷ 2.37 = 12.2 → 13 boxes. The pattern choice adds one box before you've cut a single border board — and on a big herringbone floor with doorways on three sides, the 15% typical can run tight, which is the argument for the spare.

Reminder

The results are planning estimates, not installation instructions. Subfloor flatness, expansion gaps at walls, transition strips at doorways and the manufacturer's own acclimatisation and layout rules all affect the real outcome. Follow the product's installation sheet, and use a professional fitter for patterned layouts if you haven't laid one before.

Frequently Asked Questions

How much extra flooring should I buy?

Plan on about 7% over the room area for straight layouts, about 12% for diagonal and about 15% for herringbone — typical trade allowances that vary by product and room shape. On top of the calculated boxes, keep one extra box unopened as future repair stock.

How many boxes of flooring do I need for a 20 m² room?

Multiply the area by your waste factor, divide by the m² per box printed on the packaging, and round up. A 20 m² (215 sq ft) room laid straight at 7% waste is 21.4 m², which comes to 9 boxes at a typical 2.5 m² per box — 10 with the spare.

How much waste does herringbone flooring need?

About 15% is the typical allowance. Every border piece is cut at an angle and often at both ends, and the offcuts left behind are usually too short to reuse. Narrow planks and rooms with many doorways or notched borders push the figure higher — when in doubt, the spare box is the hedge.

Do I need underlay under my new floor?

Most floating floors — laminate and engineered click boards — call for a foam underlay, and concrete subfloors typically add a vapour barrier layer beneath it. The product's installation sheet is the authority. The calculator sizes underlay at the room area + 5% for trimming.

Why should flooring boxes match lot numbers?

Colour, tone and grain vary between production batches. Mixed lots laid in one room show as visible banding, and years later only a same-lot plank will repair invisibly. Check the batch code on every box before opening the first one, and buy the spare from the same batch at the same time.

Total Required
—
View Details